I applied in-person. The process took 1 week. I interviewed at Pakistan Petroleum Limited (Karāchi) in Oct 2011
Interview
i have given 3 interviews, first taken by deputy chief of Infrastructure , the response was very positive .second interview was below average the taken my system administrator. 3rd interview taken my General Manger of IT , it was about 45 min interview , response was very positive and i am hired as a resident engineer.