I applied through a staffing agency. The process took 3 weeks. I interviewed at Arabian Drilling (Manila, Manila)
Interview
It's so significant and reliable.He asked me how to fabricate a structural column. What should I do 1st.And I gave Him an accurate answered. I told him First move checking the dimention my making a drawing. second checking materials if available and third is to proceed to lay out out and fabricate.