I interviewed at McLaren Engineering Group (New York, NY)
Interview
Had a quick phone call interview with HR. Then I got set up a zoom interview with VP, technical director, and technical lead to discuss my experience. Some technical related design questions were asked during the interview.
I applied online. The process took 3 weeks. I interviewed at McLaren Engineering Group in Nov 2023
Interview
I interviewed at McLaren Engineering in Woodcliff Lake, NJ in November 2023. Start to end was approximately three weeks.
First interview was an HR screening. Second was a technical interview to review the preliminaries of the position. Third was on-site meeting with members of staff to review specific skill sets for position. Ghosted after low salary band was quoted and I countered with national average for this role. Very disappointing experience.
I applied through an employee referral. I interviewed at McLaren Engineering Group (Woking, England)
Interview
Interview process was quite straight forward and easy one. Once resume is sorted then job is all yours. I had 3 rounds. 2 technical and 1 management round. Interview panel was very knowledgeable.
Interview questions [1]
Question 1
Why should I be selected and how will I add value to the position?