The hiring process at Cabtec takes an average of 1 day when considering 1 user submitted interviews across all job titles. Candidates applying for Project Manager had the quickest hiring process (on average 1 day), whereas Project Manager roles had the slowest hiring process (on average 1 day).
I applied online. The process took 2 weeks. I interviewed at Cabtec (Wilmington, DE) in Jun 2011
Interview
Phone interview followed by in person interview. We talked about my experience and what possibilities existed for scale-up in China. Also discussed my work history, education, and capabilities. We talked about both our similarities and generated a great bonding and method for reaching out to each other.
I applied online. The process took 5 days. I interviewed at Cabtec
Interview
process started with owner, toured plant, was given overview of how company works. on second visit , met with both owners and operations manager. was grilled very hard. numerous times all 3 left room to discuss amongst themselves and then back to me. questions were hard and attitude was almost confrontional
The process took 1 day. I interviewed at Cabtec (Regina, SK) in Aug 2010
Interview
I was interviewed by Don, who showed me the whole manufacturing operation, from ordering supplies to setting up the product, and then shipping out to various locations. Don then took me around and introduced me to the other staff, and finally introduced me to one of the brothers that owns the business. After that, the owner came in and took over the interview. The line of questioning and the tone of the interview, was enough for me to withdraw my resume right then and there.
Interview questions [1]
Question 1
How much do you want? What makes you think a female is worth that kind of money?